Category Archive

Epinal to Charmes Epinal to Charmes

Entering the locks continually caused issues as the fenders rose upon connecting with, then proceeding to run along the walls. This in turn meant the hull was no longer protected and Gratis new paintwork was damaged. Today we experimented with the fenders by lowering them until they sat horizontally upon the water rather than vertically […]

Pont des Forges to Epinal Pont des Forges to Epinal

An early start – as starts went, that was when locks didn’t open until 9am – on a grey drizzly day, yet not that cool: a change pleasant change to the heat of the sun beating down. The numbering system recommencing at ‘one’, the downward journey upon the Golbey Stair case – 15 locks one […]